https://www.guru3d.com/news-story/nvidia-allegedly-moving-ampere-to-7-nm-tsmc-in-2021.html
Sorry if this has already been posted
One thing is clear, Samsung can't produce the Ampere-based GPUs quick enough or in enough volume so, from the looks of things, NVIDIA will be moving a large chunk of wafer fabrication to TSMC.
The news reached the web today though DigiTimes. And if true that means that NVIDIA likely will slip towards 7nm wafer die production, as expected for a long time in the first place. What also is possible it that the 'update' product like an RTX 3080 with 20GB or other products like the RTX 3050/3060 in the lineup that has not been released just yet move to that TSMC 7nm node.
DigiTimes states Nvidia has already booked high volume production capacity on TSMC’s 7 nm nodes for 2021. TSMC recently lowered the prices on the 7nm wafers and also mentions the choice is made to spread risk that is yield related.
Sorry if this has already been posted