Interesting. I'm guessing by max in left hand side you mean max weight to load? And all the rest in orange you want to load as is written?
2ct pause = 2 sec pause? And what do you mean by RPE.
Sorry man, there is a lot of notes to be added.
Max is the most you've done (with fair form to a standard you can hold yourself to)
Once you input those the sheet will calculate the weights you're going to do for each set.
RPE in this case is just used as reps in reserve (RIR) it's out of 10 so a 9 would mean you have one left, an 8 would mean 2 left. An 8.5 eould mean definitely one and maybe a second.
2ct is a 2 count, in your head count to 2, for most peope with weight on them this is roughly a 1 second pause.